 |
 |
| BEFORE TREATMENT, DIAGNOSIS IS DIFFICULT |
RUBBER DAM > PERFECT ISOLATION OF THE SITE |
 |
 |
 |
| PREPARATION WITH AIR-FLOW® PREP K1 MAX AFTER 10 SECONDS |
PREPARATION WITH AIR-FLOW® PREP K1 MAX AFTER ANOTHER 20 SECONDS |
 |
 |
 |
| PREPARATION WITH AIR-FLOW® PREP K1 MAX AFTER ANOTHER 10 SECONDS |
PREPARATION WITH AIR-FLOW® PREP K1 MAX AFTER ANOTHER 20 SECONDS |
 |
 |
 |
| NO MORE DECAY DETECTED |
ACID ETCHING ENSURES GOOD ADHESION |
 |
 |
 |
| BONDING IMPORTANT STEP TO REACH QUALITY |
FLOWABLE COMPOSITE TO FILL DEEP NARROW CAVITIES |
 |
 |
| EXCELLENT QUALITY & ESTHETIC RESULT |